Longitudinal measurements

Line graph example: monthly dates

An illustrative line graph of two sites measured on ISO dates. Learn how a proportional date axis preserves different calendar intervals.

Open this example in the editorStart from scratch

Site ASite B3.544.555.562026-01-012026-01-242026-02-152026-03-102026-04-01DateValue
Illustrative measurements at two sites on the first day of January through April 2026. Illustrative data.

About this example

This line graph uses four illustrative ISO dates and measurements from two sites. Site A rises from 4.2 to 5.7, while Site B rises from 3.7 to 4.9. The example does not assign physical units to these values.

Enter dates as YYYY-MM-DD in the first column and one measurement series in each remaining column. Date positions reflect elapsed time: January 1 to February 1 spans 31 days, February 1 to March 1 spans 28, and March 1 to April 1 spans 31.

Rows are sorted chronologically; invalid dates are excluded and reported. Replace the measurements and add units before using the figure in a report. For a numeric X axis, open the annual-publications or treatment-trends example.

The data

DateSite ASite B
2026-01-014.23.7
2026-02-014.84.1
2026-03-015.14.5
2026-04-015.74.9

Rows are sorted by X; missing Y values leave gaps. No statistical test is calculated. Open the example, replace the data with your own, and export the figure as SVG, PDF, PNG or TIFF.

More examples